June 15, 2010
Die Sinker EDM Electrode
At my internship, this week I have been working on machining two identical copper electrodes for one of the lab members to do some testing on the Electron Beam Melting machine. This machine is used to smooth the surface of mold parts created on EDM machines. Its works in vacuum by using a wide beam of electrons to sweep across the part melting the surface on a microscopic level producing a mirror finish. Here are a few shots of the three processes to complete the electrode including roughing, semi-finishing, and finishing. The finishing is done with an R1.5mm ball end mill (3mm diameter) with a 2% step-over (0.06mm step-over) which produced nearly a mirror finish. I accidentally put scratches on the surface by using a rag to wipe off the coolant. Total machining time was a little under 2 hours.
May 4, 2010
UC Davis Seal Project
Top secret lab internships are really interesting, especially ones with expensive CNC machine tools that you get to learn how to operate. I've been working hard on a test project to turn the UC Davis seal 2D image into a 3D solid model and machine out of aluminum. This is just step one of the project. Well more so steps 1 through 3 with probably 5 or so more steps to go. I first created the solid model in SolidWorks which was then imported into Esprit 2010 CAM software to generate the tool paths to machine in aluminum stock. Once the NC code was generated I ran on one of the small 3 axis linear motor CNC machines.The next step in the project is to scale it down to smaller sizes. Right now it is about the size of a coffee mug (~70mm) and the goal is to get it down to the size of a cufflink between 10-15mm. And there's more. The next goal is to create the negative form of this so that it can be used on a die sinker EDM machine to die sink into titanium cufflinks. Im not sure how well this is going to go; I'm imagining a lot of frustration. Anyway, enjoy the pictures.

April 15, 2010
General Update
Finally those uprights that I wrote a post about got finished today.. completely finished. After many hours the final finishing pass to bore out the center for the bearing was completed. The bearings snugly tap in and the snap ring pops right into place in the groove. The setup looks quite impressive with the brake caliper and bottom lugs bolted into place. I'll have to shoot some pictures of everything together.
Also the rear subframe is coming together nicely as well. There's still a lot of small (annoying) things that need to be finished on it, mainly drilling and tapping holes for things. But at the moment the assembly is mounted to the engine with the shocks and springs mounted (and functional!).
Also the rear subframe is coming together nicely as well. There's still a lot of small (annoying) things that need to be finished on it, mainly drilling and tapping holes for things. But at the moment the assembly is mounted to the engine with the shocks and springs mounted (and functional!).
March 18, 2010
Subframe Assembly
The rear subframe is starting to take shape. I drilled the 66 holes, counterbored some and reamed others to the proper sizes, then pressed dowel pins in an "every other" pattern. The side plates are both bolted and dowel pinned together. The idea is that the dowel pins are hardened to around 60 Rockwell and one hole side is reamed to .249" and the other hole is reamed over to .251" (dowel pins being .250" ideally) giving a secure fit between the pieces. The fit is so close that I have to tap the pieces together with a rubber mallet and also to get them apart. Once the pieces are together, 1/4-20 bolts are tightened down so the pieces dont come apart. The dowel pins provide much more rigidity and shear strength when compared to only bolts holding the subframe together. I have worked on the bellcrank mount and made spacers for the shocks and bolts those in place as well. The springs are on order, hopefully they will be in soon. There is a lot more work on this thing, updates to come.
March 5, 2010
Subframe Back Plate
Spending lots of time in the student shop working on the formula SAE car, today was my first official part that I designed, generated tool paths, then drilled/tapped and CNC milled on the Bridgeports in the shop. It was all of my creation. This piece is a crucial part of the rear subframe that is being designed for the new race car. All of the rear suspension, drive shafts, and differential all mount in the box-ish aluminum subframe that bolts to the back of the engine. By removing 6 bolts, the whole rear portion of the car comes off, away from the engine. I wish I had a picture of the design, its pretty trippy, and its still up in the air if its going to work. Fingers crossed! This part took a lot of setup and different operations. I wont go into details but there was a lot of drilling and tapping, then some CNC work. In the end, the part turned out flawlessly and should work very well. Enjoy the pictures. The first two show CAM tool path simulations.
February 15, 2010
Formula SAE Rear Uprights
After learning Esprit 2010 CAM software, we have been using this to create rear uprights for the Formula SAE team. It has been a huge learning experience, including multiple failures and problems along the way. A huge problem arose when trying to post process the code from Esprit to the Acu-rite controller for the Bridgeports in the shop. After re-writing and editing a generic 3-axis post processor for Esprit (again including many trial and error failures) we now have a working post processor for our setup. These uprights are milled out from a 4 x 8 x 1.8" block of aluminum. Much of the material is removed using 4 tools including roughing, ball and flat end mills. Posted below are pictures that document the process from solid model, to CAM tool paths, to final part (well almost final, final pictures will be updated soon).
Labels:
Acu-rite,
Bridgeport,
Esprit,
Formula SAE,
Uprights
February 13, 2010
Control Parts for Second Build
So I decided that I should invest in some new bearings, shaft collars and couplers for my second machine. Purchased some pretty basic stuff, Lovejoy couplers one side 1/2" the other 1/4", 1/2" shaft collars for the lead screws and some 1/2" ID bearings for the 3 axes. Bearings were from Ebay while the collars and couplers were from McMaster Carr; in all I think I spent around $35 for everything.
Subscribe to:
Posts (Atom)






